What constitutes a bad day for a General Contractor? Could it be a part being off in size? Could it be a delay causing a schedule to be delayed? How about building an entire shaft for a specific elevator and finding out the shaft needed to be reworked after the fact?
Scenario three was a real occurrence. The contractor had to rework the entire shaft by a measly six inches in order to fit a different style of elevator into it.
PlanGrid, the cloud-based solution....